Renewable Energy Installations in WI

Thursday, November 19, 2009

The staggering cost of new nuclear power

From an article by Joseph Room on Center for American Progress:

A new study puts the generation costs for power from new nuclear plants at 25 to 30 cents per kilowatt-hour—triple current U.S. electricity rates!

This staggering price is far higher than the cost of a variety of carbon-free renewable power sources available today—and 10 times the cost of energy efficiency (see “Is 450 ppm possible? Part 5: Old coal’s out, can’t wait for new nukes, so what do we do NOW?”

The new study, “Business Risks and Costs of New Nuclear Power,” is one of the most detailed cost analyses publically available on the current generation of nuclear power plants being considered in this country. It is by a leading expert in power plant costs, Craig A. Severance. A practicing CPA, Severance is co-author of The Economics of Nuclear and Coal Power (Praeger 1976), and former assistant to the chairman and to commerce counsel, Iowa State Commerce Commission.

This important new analysis is being published by Climate Progress because it fills a critical gap in the current debate over nuclear power—transparency. Severance explains:

All assumptions, and methods of calculation are clearly stated. The piece is a deliberate effort to demystify the entire process, so that anyone reading it (including non-technical readers) can develop a clear understanding of how total generation costs per kWh come together.
As stunning as this new, detailed cost estimate is, it should not come as a total surprise. I detailed the escalating capital costs of nuclear power in my May 2008 report, “The Self-Limiting Future of Nuclear Power.” And in a story last week on nuclear power’s supposed comeback, Time magazine notes that nuclear plants’ capital costs are “out of control,” concluding:

Most efficiency improvements have been priced at 1¢ to 3¢ per kilowatt-hour, while new nuclear energy is on track to cost 15¢ to 20¢ per kilowatt-hour. And no nuclear plant has ever been completed on budget.
Time buried that in the penultimate paragraph of the story!

No comments: